HP252 Application

Examples of applications from daily practice:

Wacker Neuson Heaters offer enormous benefits
and cost savings. They are designed to improve
climatic conditions for construction and working sites as
well as many other locations where ever certain
temperatures are required.
Create an optimal working atmosphere in large spaces.
Support the development of wind turbines.
Safe heat in oil and gas production.


Create an optimal working atmosphere in large spaces.

Saving Potentials
Calculation example compared to decentralized application of four traditional hydronic air heaters You Save up to 58% in heating costs.

Your challenge

Christmas business at a large mail order company: In order to compensate for peak loads, an additional warehouse is temporarily rented. Due to the outside winter temperatures, the inside temperatures fall significantly below the legally prescribed minimum temperature for working areas – making conditions unsuitable for employees.

Our Solutions

Hydronic Air Heater HP252
The innovative heating system of the HP252 can transform the cold warehouse in no time into an ideal workplace. By connecting up to 16 heat exchangers, the HP252 produces clean, warm air and creates an environment in which your employees can optimally work. The heating system can be placed conveniently outside of the building.

Placing the heat exchangers
Distribute the flexible heat exchanger evenly throughout the hall up to 60 meters away from the central heating system. A distance in height of up to 30 meters is possible.

Placing the hoses
The heating fluid is pumped through the flexible hoses to the heat exchangers and then re-directed to the central heating system. The hoses can be placed closely along the wall for safety and to save space.

Heating even in separate rooms
The heat exchangers can be flexibly distributed in several rooms. By positioning them in side rooms and/or smaller parts of the building they will take the heat exactly to where you need it.


top

Support the development of wind turbines.

Saving Potentials
Compared to the usage of four conventional Air Heaters
You Save: up to 70% heating costs

Your challenge

The construction of a wind farm takes much longer than planned due to numerous delays. Now we need to make the best of the situation to remain on schedule and finish the wind farm project.

Our Solutions

Drying foundations with the Hydronic Surface Heater HSH700
The HSH700 prepares the concrete foundation of the wind turbine for its further processing. By heating up the concrete to cure in a short time further construction can continue. Compared to the decentralized use of four air heaters you save up to 70 percent of heating costs!

Water vapor barrier film, heating hose and insulation mats
By placing the water vapor barrier film, the heating hose and the insulation mats evenly on the fresh concrete surface, you provide optimal curing conditions for the concrete. After a few days you will receive a stable foundation for your wind turbine.

Drying the fresh paint of the tower with the HP252
Dry the fresh paint after installation and painting of the tower in no time with the HP252. Therefore you place the heater on the ground and the heat exchanger in a cage attached to the tower, to dry the paint. So you can complete the wind turbine very quickly.

top

Safe heat in oil and gas production.

Smart combination of various heating devices
De-icing pipes and lines, thawing ground, indoor heating - our wide range of models provides the right heating solution for every need. 

Your challenge

The exploration and mining of oil and gas reserves in the cold winter months are possible only with appropriate heating. The requirements for the entire technical equipment are extreme - from dealing with low temperatures to high winds and snowfall. There are also rigorous safety regulations. Now you need to create ideal conditions in each work area with the use of the right heater.

Our Solutions

Hydronic Heater to prevent pipes and lines from freezing
Using hydronic heaters keeps ice and frost away from your pipes and lines by wrapping the heating hose around them. This avoids liquids and chemicals to freeze and block the pipes.

Protecting pumps and valves
Also the pumps, the protection valve and the area around the borehole are protected from freezing by using hydronic heaters: place the heating hose around the equipment to achieve the optimum temperature to keep it free of frost and ice.

Air heaters for operational drilling units.
With air heaters such as the HI260 you create a pleasantand safe working environment around your drilling units. The heater can bepositioned away from the drilling rig and ducted to where the warm air isneeded, providing a safe, warm working space for personnel and equipment. By providingheat to the drill rig, optimum lubricity of the rig’s oil is maintained,extending the life of your drill rig.

Perfect lighting - The Light Tower
The Wacker Neuson Light Tower provides the perfect illumination of your working site. The mobile, powerful light supply achieves a daylight-like illumination, thanks to its own generator it operates fully independent, and provides up to 73 hours of light due to the large fuel tank.